Wind tower production line

A major advantage of wind is that it is a clean and renewable form of energy. Its production of electricity has no direct carbon emissions or air pollutants and does not consume water. Wind energy is becoming an increasingly important part of the global electricity supply mix. 

ACME cooperated with one client in the Netherlands about wind tower production line. It is mainly divided into plate CNC cutting blanking, single section cylinder rolling forming, single section cylinder straight seam welding, flange and cylinder nipple compound, barrel section one by one group of inside and outside the girth welding, sandblasting derusting, anticorrosive paint drying process, etc. The whole production line fully automated operation, improve the working efficiency.


25

process

CONTACT US

NO.1-2317, Jincheng Road, Xinwu District, Wuxi, Jiangsu, China
  sales@acmemachinery.cn
+86-15716172181
 +86-0510-83950905
 15716172181
  Jessie Gao
15716172181

FEEDBACK

​Copyright © Wuxi Acme Machinery Co.,Ltd. All Rights Reserved.   Supported By Leadong  Sitemap